The Work Continues
As the concrete was poured, large bolts were inserted into the drying mixture. Then rails were placed on top of these bolts and secured into place. This is the foundation of the shelter. The framework is a series of "ribs" that will fit over the rectangular projections shown below. Then the metal roof and siding will go on. This concrete was left to cure for a couple of days. The rest of the work will take place on Friday and it should be completed in one day.